Re: [PROPOSAL] Prepare Beam 2.9.0 release


Great. Thanks all.

If you have any potential blockers for 2.9.0 release please add them to burndown list. Also let's try to get blockers resolved before the proposed branch cut date (21st).

Thanks,
Cham

On Fri, Nov 16, 2018 at 3:30 AM Łukasz Gajowy <lgajowy@xxxxxxxxxx> wrote:
+1 

Thanks, 
Łukasz

pt., 16 lis 2018, 12:00: Maximilian Michels <mxm@xxxxxxxxxx> napisał(a):
+1 for starting the release process in time

 > Note that we need to temporarily revert
https://github.com/apache/beam/pull/6683 before the release branch cut
per the discussion

+1

Thanks,
Max

On 16.11.18 07:53, Charles Chen wrote:
> +1
>
> Note that we need to temporarily revert
> https://github.com/apache/beam/pull/6683 before the release branch cut
> per the discussion at
> https://lists.apache.org/thread.html/78fe33dc41b04886f5355d66d50359265bfa2985580bb70f79c53545@%3Cdev.beam.apache.org%3E
>
> On Thu, Nov 15, 2018 at 9:18 PM Tim <timrobertson100@xxxxxxxxx
> <mailto:timrobertson100@xxxxxxxxx>> wrote:
>
>     Thanks Cham
>     +1
>
>     On 16 Nov 2018, at 05:30, Thomas Weise <thw@xxxxxxxxxx
>     <mailto:thw@xxxxxxxxxx>> wrote:
>
>>     +1
>>
>>
>>     On Thu, Nov 15, 2018 at 4:34 PM Ahmet Altay <altay@xxxxxxxxxx
>>     <mailto:altay@xxxxxxxxxx>> wrote:
>>
>>         +1 Thank you.
>>
>>         On Thu, Nov 15, 2018 at 4:22 PM, Kenneth Knowles
>>         <kenn@xxxxxxxxxx <mailto:kenn@xxxxxxxxxx>> wrote:
>>
>>             SGTM. Thanks for keeping track of the schedule.
>>
>>             Kenn
>>
>>             On Thu, Nov 15, 2018 at 1:59 PM Chamikara Jayalath
>>             <chamikara@xxxxxxxxxx <mailto:chamikara@xxxxxxxxxx>> wrote:
>>
>>                 Hi All,
>>
>>                 According to the release calendar [1] branch cut date
>>                 for Beam 2.9.0 release is 11/21/2018. Since previous
>>                 release branch was cut close to the respective
>>                 calendar date I'd like to propose cutting release
>>                 branch for 2.9.0 on 11/21/2018. Next week is
>>                 Thanksgiving holiday in US and possibly some folks
>>                 will be out so we can try to produce RC1 on Monday
>>                 after (11/26/2018). We can attend to current blocker
>>                 JIRAs [2] in the meantime.
>>
>>                 I'd like to volunteer to perform this release.
>>
>>                 WDYT ?
>>
>>                 Thanks,
>>                 Cham
>>
>>                 [1]
>>                 https://calendar.google.com/calendar/embed?src="">
>>                 [2]
https://s.apache.org/beam-2.9.0-burndown
>>
>>